Informasi Detil Paper


Judul: Analisis Ergonomi Pada Proses Mesin Tenun Dengan Pendekatan Subjektifitas Pada PT Industri Sandang Nusantara Unit Makateks Makassar
Penulis: Hamdani Kubangun  || email: koe_dani@yahoo.com
Jurnal: Arika Vol. 4 no. 1 - hal. 61-70 Tahun 2010  [ Teknik ]
Keywords:  Ergonomic, Machine Process, Subjectivity
Abstract: To reveal the workers comfort in doing the job activity on the loom, it is necessary to know standard output produced by the workers during a workday, the energy consumption required in work activities that can increase productivity and examine the complaints and sense of fatigue on the weaving machine operators. Results of processing of standard working hours operating time to complete 60 meters of plastic sacks subjectivity takes 69.79 minutes. And heart rate (physiological performance) before work will be conducted comparisons of the energy when the operator works with estimated energy expenditure 2.3 kcal / min from the results of this comparison is the average energy expenditure has been insufficient demand service or standards issued by Lehman. This is caused by conditions that are not too many movements such as ergonomic work and the workload that must be borne by the body especially the legs, hands, arms and shoulders.
File PDF: Download fulltext PDF PDF

<<< Previous Record Next Record >>>